top of page
Search

Midland Railway 4F Repair

Here is a rather weathered Midland Railway 4F, overall poor running.


On inspection the loco pickups have been struggling with connection to the wheels, these required a good clean. Secondly the motor was stalling at a very low voltage without any load. A new motor has been fitted. Finally the customer required new coupling rods, on first fitment highlighted a chassis miss alignment, so axel bushes were re-fixed in a jig.



 
 
 

Σχόλια


Post: Blog2_Post

TheLocoWorks Ltd

12 Fairways Drive, Kirkby-in-Ashfield, Nottinghamshire, NG17 8NY

©2022 by TheLocoWorks.

bottom of page